Supply of electrical components for the new T3 substation
- Expansion of the existing plant of Bakery La Lorraine Kladno with a new building T3
- Installation of power supply lines at HV and LV level for the new main HV substation and LV switchgear
- Realization 2019 to 2022
T3 substation equipment
- Delivery and installation of a 22kV HV substation with 25 fields (Schneider SM6 switchgear)
- Delivery and installation of 7 pcs of 22/0.4 kV power transformers with total installed capacity of 11,6 MVA
- Installation of main technological and compensating LV switchgear
- Supply and installation of cable HV and LV power distribution systems
- Tests, revisions and commissioning